The pre-frost repair window has closed for this year. We still patch and repair tarmac through the winter on dry, frost-free days, so send us photos and we will book you into the first suitable week.
A tarmac driveway rarely fails all at once. It fails one crack at a time, and every one of those cracks gets dramatically worse over a winter.
Potholes, crumbling edges and crack filling are all quick jobs when the surface is dry and the ground is not frozen. We cut the damaged area out square, make the base good, and hot-fill and compact it flush, usually in a day. The same jobs in January are at the mercy of the weather, and the same defects are twice the size.
Tarmac fails from the water in, not from the traffic on top. A hairline crack in September lets rain into the base. The first hard frost freezes that water, it expands, and the surface lifts around it. Every freeze and thaw after that widens the hole. A pothole that costs a couple of hundred pounds to cut out and hot-fill in October is a sunken, crumbling patch by March that needs the base rebuilding. The autumn survey is about catching the ones that are still small.
There is a practical reason to do this now rather than in the new year too. Hot tarmac needs to be laid and compacted before it cools, and it needs a dry, frost-free surface to bond to. From late November onwards we lose days to weather every week. October and early November still give us reliable working days, which means we can give you a date and keep it.
To be straight with you: there is no seasonal discount attached to this. What there is, is a repair done while it is still a repair, a date we can keep because the weather still lets us, and a driveway that gets through the winter in one piece.
Rain on the day and frost in the surface. Hot tarmac will not bond to a wet or frozen surface, so a wet day is a lost day. That is why the cut-off is the end of October: October and early November still give us more dry days than wet ones. From December we are fitting repairs around the forecast rather than the diary.

Call 01785 875179 or use the contact form. Surveys take about half an hour and there is no obligation attached to one.
If the drive sinks when you stand on it, or the cracks are everywhere rather than in patches, a repair is the wrong spend. See new tarmac driveways and we will tell you honestly which one you need.
Most tarmac repairs take one to two days on site. Everything before that is a quick survey and a written quote, and this is the honest version of it.
Send two or three photos and a postcode, or book a free survey. Book by Friday 30 October 2026 for a pre-frost date.
Itemised, in writing, usually within a couple of days. Which areas are being cut out, what is being filled, and whether an overlay makes more sense.
A date in writing, weather permitting. Last pre-frost repairs are booked for the week commencing Monday 23 November.
One to two days on site for most repairs. Patches and potholes are usable the same day; a full overlay needs one night.
The damaged area cut out square, the base checked and made good, then hot tarmac laid and compacted flush. No cold-lay bags, no sinking six weeks later.
View options →Cracks sealed before the water gets in, and crumbling edges rebuilt with proper restraint so they stop breaking away every winter.
View options →Where the base is sound but the surface is tired, a new wearing course over the existing tarmac. A brand-new looking driveway without the excavation, while the weather still allows it.
View options →Elsewhere in the county? See the Stafford & Stone or Newcastle & Stoke block paving pages, or new tarmac driveways.
Because winter is what turns a small defect into a big one. Water sits in cracks and potholes, freezes, expands and breaks the surface apart, then the next thaw washes the loose material out. Every freeze-thaw cycle makes the hole bigger and the base wetter. A repair done in October holds the surface together through all of that. The same defect left until March usually needs the base rebuilding as well as the surface.
Hot tarmac can be laid in cool weather, but it needs a dry, frost-free surface to bond to and it has to be compacted before it cools. From late November we lose working days to frost and rain every week, which is why the survey cut-off is the end of October. Between now and then we can give you a date and keep it.
Send us a couple of photos and a postcode and we will usually tell you the same day. As a rule, if the damage is in specific areas and the base underneath is still firm, a repair is the right answer. If the surface is cracked all over, or areas sink when you stand on them, the base has failed and a repair would be money wasted. We will say which, honestly, at the survey.
A hot-fill patch is darker than weathered tarmac for the first few months and blends in over the following year. If the whole surface is tired, an overlay resurfacing gives a uniform finish across the lot, and that is often the better option when there are more than a few patches to do.
Yes for patches and pothole repairs: the tarmac is compacted and cooled within a couple of hours and you can drive on it the same day. For a full overlay resurfacing we ask you to keep vehicles off it until the following morning.
The whole of Staffordshire: Stafford, Stone, Eccleshall, Penkridge, Newcastle-under-Lyme, Stoke-on-Trent, Trentham, Longton, Uttoxeter, Cannock, Hednesford, Rugeley and the villages between. If you are in an ST, WS11, WS12 or WS15 postcode we cover you.
Free survey, written itemised quotation, and the first available date in the new year. Staffordshire and every village between.